How long does it take to get a building permit in Mississauga?
These are the average times for processing and issuing a permit: New residential (detached, semi) – 13 weeks. Residential alteration (detached, semi) – 7 weeks. Second unit – 10 weeks.Similarly, how big of a shed can I build without a permit in Mississauga?The size of all detached garages, car...